Project Galleries

Sully’s Superette – Goffstown NH

  • Design Build Construction Project.
  • Front entrance was removed and relocated.
  • New entrance vestibule and interior renovations.
  • The exterior was finished with faux stone and vinyl siding.

Nashua Farmer’s Exchange – Nashua NH

  • This project was an interior renovation with a focus on energy efficiency upgrades.
  • Schroeder Construction worked with the better buildings program to receive funding for the retrofit applications.
  • Blown in cellulose insulation was added to the ceiling, walls and floors significantly reducing the buildings fuel usage.
  • This Building was originally and old train station built in 1860.

Monadnock Regional High School – Swanzey NH

Energy Renovations to The Monadnock Regional High School in Swanzey, NH
Project Scope Of Work:
  • Mechanical, Electrical, Roofing for new high efficiency boilers & radiant heat panels, Replaced 3,500SF of exterior curtain walls with New Thin Brick and EIFS walls, New Aluminum Windows.
  • Renovated 10,000SF of Classroom Space

Project Started on June 25th 2012 and was completed on time for school to open on Sept 27th 2012


Moody Building – Claremont NH

Energy Renovation Project to the Moody Building in Claremont NH

  • 2 layers of 3″ Polyisocyanurate applied to roof deck giving an R-value of 36.
  • 60 mil reinforced PVC membrane applied to roof as thermal barrier.
  • 12″ of blown in cellulose applied to the attic space.
  • Mechanical upgrade to high efficiency systems.
  • Roofing and Masonry work completed to accommodate energy renovation.

 


The Hunt Memorial Building – Nashua NH

Historical Renovation of The Hunt Memorial Building
Project Scope of Work:
  • Mechanical, Electrical, Insulation, Masonry, Flooring and Acoustical Ceiling Work.
The challenging pieces of the project were
  • Excavating a new Elevator Pit and installing a new Elevator,
  • Window Restoration and New Skylight
Project was completed on time with a tight budget

Church Of The Good Shepherd – Nashua NH

CM Contract to manage 4 year phased capital improvements
Project started in 2006
Work Involved
  • Drainage Improvements
  • New Mechanical System
  • Masonry Restoration
  • New Slate Roof
  • Selective Interior Reno.
Project Completed in Dec. of 2010
Yearly Maintenance Work Still Ongoing

Airex Filter Corp. – Hudson NH

Designed Build Construction Management Contract for 10,000 SF addition
Project Planning
  • Brought project through planning and construction in Hudson, NH

Goegrid sub-surface site preparation

  • Used to avoid costly asbestos soil abatement

Pre-Engineered Building used to save time and cost on project

  • Ceco Building Systems

VISTA Foods


Harvest Market (Rt. 101 Bedford NH)


Jennings Metal Building – Hollis NH


Manchester Housing Authority – Manchester NH


Soverign Bank – Nashua NH


USPS Facility Management


Bikram Yoga – Concord NH